 |
U.C. Berkeley Morgan Hall
Berkeley, CA
Client: University of California, Berkeley
Architect:
This project involved an upgrade of an existing 2,000 sq. ft. laboratory. The site was located within an occupied building with upgrades to a busy corridor. The work included installation of fume hoods and process piping for distilled water, compressed air, and natural gas. The scope included new chemical resistant drain lines installed below the second floor and handicapped work stations. |